Cap Spark Tester

Configuration of equipment:

High voltage: between 20 and 28 kV depending on thickness of material, positioning of probeand ground fixture.

Test cycle: between 20 to 100ms depending on length of high voltage cable;

Humidity level in the air around: less than 70%;

The probe has to be at the exact same position from one test to another one.